NOνA Assembly/QA Procedures

docid WBS WBS description Title
4978 WBS 2.0 ANU Construction ANU Horn 2 Relocation to Medium Energy
3550 WBS 2.1 Site and Building Cooperative Agreement Cost Accounting Information
2996 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement IPT Responsility Matrix
3544 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement Change Procedures
3980 WBS 2.2 Liquid Scintillator The IU Spectrophophotometer and Lovibond Tintometer
3981 WBS 2.2 Liquid Scintillator Chemical Analysis Methods for the Determination of the Composition of Liquid Scintillator
3982 WBS 2.2 Liquid Scintillator Setting Tintometer Specs for the NOvA Liquid Scintillator
3984 WBS 2.2 Liquid Scintillator Scintillator Light Output QA Test Plan
5263 WBS 2.2 Liquid Scintillator Procedure for Testing Light Transmission in the Lovibond Tintometer
5828 WBS 2.2 Liquid Scintillator Tintometer Procedures
6702 WBS 2.2 Liquid Scintillator Tintometer Testing Procedures at Ash River
6999 WBS 2.2 Liquid Scintillator Qualification Procedures for Mineral Oil or Scintillator with IU Spectrophotometer (NEW)
7440 WBS 2.2 Liquid Scintillator Scintillator Light Yield Test (NEW)
3698 WBS 2.4 PVC Extrusions QC Procedures for PVC Extrusions
5212 WBS 2.4 PVC Extrusions Procedure to Operate Reflectometer
3912 WBS 2.4 PVC Extrusions Procedure for Extrusion Length and Weight Measurements
3828 WBS 2.5 PVC Modules Descriptions of Equipment/Machines at Module Factory
3829 WBS 2.5 PVC Modules Safety Concerns and Risk Mitigation for Machines in Module Factory
5091 WBS 2.5 PVC Modules Procedures for Near Detector Module Production
5109 WBS 2.5 PVC Modules NOvA PVC Pressure Testing Procedures
5186 WBS 2.5 PVC Modules Module Factory Far Detector Safety and Training Procedure Documents
5212 WBS 2.5 PVC Modules Procedure to Operate Reflectometer
6991 WBS 2.5 PVC Modules Extrusion Truck Unloading/Caster Jack Use Procedure
6927 WBS 2.5 PVC Modules 2 TO 1 Module Assembly Procedure
6962 WBS 2.5 PVC Modules Corona Discharge, Side/Center Seals and Snout Installation - Module Assembly Procedures
7138 WBS 2.5 PVC Modules Module Fiber Stringing Procedure
7150 WBS 2.5 PVC Modules Manifold/Endplate Cover Installation Procedure
6935 WBS 2.5 PVC Modules Outer Seals Module Assembly Procedure
6934 WBS 2.5 PVC Modules Bubbler Module Assembly Procedure
7284 WBS 2.5 PVC Modules Module Painting Procedure
7285 WBS 2.5 PVC Modules Final Quality Assurance Procedures
5601 WBS 2.6 Electronics Production Test Procedures for Power Distribution System
4775 WBS 2.6 Electronics Production FEB and APD Installation Procedures
5657 WBS 2.6 Electronics Production NOvA Data Concentrator Module (DCM) Installation and Checkout Procedure Guide
6997 WBS 2.6 Electronics Production TDU Setup & Test Guide
7809 WBS 2.6 Electronics Production TDU Installation Guide (NEW)
6444 WBS 2.7 Data Acquisition Systems Production NOvA DCM Initial Test and Startup Procedure
4642 WBS 2.8 Near Detector Assembly Near Detector Assembly Procedure
5118 WBS 2.8 Near Detector Assembly ND Scint filling procedure and hazard analysis
5276 WBS 2.8 Near Detector Assembly Scintillator Fill Machine Test Procedure
5465 WBS 2.8 Near Detector Assembly NDOS Water Cooling System
5891 WBS 2.8 Near Detector Assembly NDOS Cracked Module Draining
5926 WBS 2.8 Near Detector Assembly Nova Near Detector Data Cable Test Procedure
6101 WBS 2.8 Near Detector Assembly Signal Cable Harness Fabrication for NDOS
6130 WBS 2.8 Near Detector Assembly Filling the NOvA NDOS Horizontal Modules with Liquid Scintillator
5355 WBS 2.9 Far Detector Assembly FHEP Pivoter Table Flatness Survey
5139 WBS 2.9 Far Detector Assembly Nova Manifold Cover Crack Repair and Reinforcement Procedure
5601 WBS 2.9 Far Detector Assembly Test Procedures for Power Distribution System (NEW)
5675 WBS 2.9 Far Detector Assembly Installation of the Power Distribution System at the Far Detector
5910 WBS 2.9 Far Detector Assembly Instrumentation for Block installation and Monitoring
6533 WBS 2.9 Far Detector Assembly FD Distribution System Commissioning Procedures (NEW)
6736 WBS 2.9 Far Detector Assembly South Bookend Distance Sensor Installation Procedure
6903 WBS 2.9 Far Detector Assembly Ash River Adhesive Machine- Procedure, HA and Engineer Documents (NEW)
7039 WBS 2.9 Far Detector Assembly Outfitting Side of Detector (NEW)
7100 WBS 2.9 Far Detector Assembly Instructions for Fiber install of DAQ Racks (NEW)
7262 WBS 2.9 Far Detector Assembly NOvA scintillator Fill Machine Test and Inspection Procedure (NEW)
7278 WBS 2.9 Far Detector Assembly Block Pivoter Operating Procedure (NEW)
7399 WBS 2.9 Far Detector Assembly Far Detector Low Voltage Rack Turn On Checklist (NEW)
7263 WBS 2.9 Far Detector Assembly Far Detector Scintillator Fill Procedures
7425 WBS 2.9 Far Detector Assembly Jar/Bottle Washing Procedure (NEW)
7440 WBS 2.9 Far Detector Assembly Scintillator Light Yield Test (NEW)
7491 WBS 2.9 Far Detector Assembly Detector High Voltage Rack Turn on Check List (NEW)
7492 WBS 2.9 Far Detector Assembly NOvA Detector Network Rack Turn on Check List (NEW)
7541 WBS 2.9 Far Detector Assembly Far Detector Assembly Procedure
7580 WBS 2.9 Far Detector Assembly Ash River Snout and Optical Connector Inspection and and Optical Connector Mechanical Measurement Procedure
7606 WBS 2.9 Far Detector Assembly Strain Gauge Mounting Procedure (NEW)
7871 WBS 2.9 Far Detector Assembly Far Detector Module Geographic Location Labeling Procedure (NEW)
7924 WBS 2.9 Far Detector Assembly PS checkout procedures after installation (NEW)
7937 WBS 2.9 Far Detector Assembly Power Distribution Box Input Labeling Procedure (NEW)
7993 WBS 2.9 Far Detector Assembly Summary for PDS installation FD (NEW)
8008 WBS 2.9 Far Detector Assembly Cooling Plumbing Sub-Assemblies (NEW)
8010 WBS 2.9 Far Detector Assembly Installation Procedure for NOvA Far Detector Block Vent System (NEW)
8174 WBS 2.9 Far Detector Assembly Fill System Draining/Priming Procedures (NEW)
8202 WBS 2.9 Far Detector Assembly DCM Communication Cable Bundling Procedure (NEW)