docid WBS WBS description Title
4978 WBS 2.0 ANU Construction ANU Horn 2 Relocation to Medium Energy
3550 WBS 2.1 Site and Building Cooperative Agreement Cost Accounting Information
2996 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement IPT Responsility Matrix
3544 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement Change Procedures
3980 WBS 2.2 Liquid Scintillator The IU Spectrophophotometer and Lovibond Tintometer
3981 WBS 2.2 Liquid Scintillator Chemical Analysis Methods for the Determination of the Composition of Liquid Scintillator
3982 WBS 2.2 Liquid Scintillator Setting Tintometer Specs for the NOvA Liquid Scintillator
3984 WBS 2.2 Liquid Scintillator Scintillator Light Output QA Test Plan
5263 WBS 2.2 Liquid Scintillator Procedure for Testing Light Transmission in the Lovibond Tintometer (NEW)
5828 WBS 2.2 Liquid Scintillator Tintometer Procedures (NEW)
3698 WBS 2.4 PVC Extrusions QC Procedures for PVC Extrusions
5212 WBS 2.4 PVC Extrusions Procedure to Operate Reflectometer (NEW)
3827 WBS 2.5 PVC Modules Module Factory Procedural Documents
3828 WBS 2.5 PVC Modules Descriptions of Equipment/Machines at Module Factory
3859 WBS 2.5 PVC Modules Fly Cutting Procedure
3858 WBS 2.5 PVC Modules Fiber Continuity Device Procedure
3860 WBS 2.5 PVC Modules Fiber Continuity Device
3829 WBS 2.5 PVC Modules Safety Concerns and Risk Mitigation for Machines in Module Factory
5091 WBS 2.5 PVC Modules Procedures for Near Detector Module Production
5109 WBS 2.5 PVC Modules NOvA PVC Pressure Testing Procedures
5186 WBS 2.5 PVC Modules Module Factory Far Detector Safety and Training Procedure Documents
5212 WBS 2.5 PVC Modules Procedure to Operate Reflectometer
5601 WBS 2.6 Electronics Production Test Procedures for Power Distribution System (NEW)
4775 WBS 2.6 Electronics Production FEB and APD Installation Procedures (NEW)
5657 WBS 2.6 Electronics Production NOvA Data Concentrator Module (DCM) Installation and Checkout Procedure Guide (NEW)
4642 WBS 2.8 Near Detector Assembly Near Detector Assembly Procedure
5118 WBS 2.8 Near Detector Assembly ND Scint filling procedure and hazard analysis
5276 WBS 2.8 Near Detector Assembly Scintillator Fill Machine Test Procedure (NEW)
5465 WBS 2.8 Near Detector Assembly NDOS Water Cooling System (NEW)
5783 WBS 2.8 Near Detector Assembly Addendum to ND Filling Procedures (NEW)
5891 WBS 2.8 Near Detector Assembly NDOS Cracked Module Draining (NEW)
5926 WBS 2.8 Near Detector Assembly Nova Near Detector Data Cable Test Procedure (NEW)
6101 WBS 2.8 Near Detector Assembly Signal Cable Harness Fabrication for NDOS (NEW)
6130 WBS 2.8 Near Detector Assembly Filling the NOvA NDOS Horizontal Modules with Liquid Scintillator (NEW)
2510 WBS 2.9 Far Detector Assembly Far Detector Filling Procedure
4775 WBS 2.6 Electronics Production FEB and APD Installation Procedures (NEW)
5355 WBS 2.9 Far Detector Assembly FHEP Pivoter Table Flatness Survey (NEW)
5139 WBS 2.9 Far Detector Assembly Nova Manifold Cover Crack Repair and Reinforcement Procedure (NEW)
5675 WBS 2.9 Far Detector Assembly Installation of the Power Distribution System at the Far Detector (NEW)
5910 WBS 2.9 Far Detector Assembly Instrumentation for Block installation and Monitoring (NEW)