NOνA Design Reviews

3079 WBS 1.9 & 2.10 Consolidated Comments from all Director's and DOE Reviews, with updated status
  WBS 1.9 & 2.10 Director's Progress Review of the NOνA Project, August 4-5, 2010
  WBS 1.9 & 2.10 DOE Mini-Review, January 28, 2010
  WBS 1.9 & 2.10 Director’s CD-3b Review of the NOvA Project, June 16-18, 2009
  WBS 1.9 & 2.10 EIR CD2 Review of the NOνA Project, June, 2008
  WBS 1.9 & 2.10 DOE CD2 Review of the NOνA Project, April 30, 2008
  WBS 1.9 & 2.10 Director’s CD-2 Mini-Review of the NOvA Project, April 17, 2008
  WBS 1.9 & 2.10 DOE CD-2/3a Review of the NOνA Project October 23-25, 2007
3065 WBS 1.9 & 2.10 DOE EIR Review of the NOvA Project, November 26-30, 2007
3064 WBS 1.9 & 2.10 DOE CD-2/3a Review of the NOvA Project, October 23-25, 2007
  WBS 1.9 & 2.10 Director’s Follow-up CD-2/3a Review of NOvA, Aug 21 - 22, 2007
  WBS 1.9 & 2.10 Director's/DOE's Performance Management System Review of the NOvA Project (6/19/07 - 6/20/07)
  WBS 1.9 & 2.10 Director’s Preliminary Review of SNuMI Plan, Nov 14-16, 2006 (portions of this work incorporated into NOvA Project)
  WBS 1.9 & 2.10 Director’s CD-2/3a Review of NOvA (6/4/06 - 6/6/07)
  WBS 1.9 & 2.10 DOE Review Committee Review of NOvA (CD-1 Review, 4/4/06 - 4/6/06)
  WBS 1.9 & 2.10 Director's CD-1 Review of NOνA (2/28/06 - 3/2/06)
  WBS 1.9 & 2.10 Director's Preliminary Review of NOνA (7/18/05 - 7/20/05)
1901 WBS_X.0 1350-ES-296427 Fabrication of ANU Kicker Magnet Ceramic Beam Tubes
2603 WBS_X.0 ANU Design Concurrence on Kicker Cable
3113 WBS_X.0 Minutes of Kicker Magnet Review/Meeting
3366 WBS_X.0 FNAL Main Injector Gap-Clearing Kicker Design Review Report
2166 WBS_X.0.1 Recycler 53 MHz LLRF System
4575 WBS_X.0.1 53 MHz RF Cavity Design Review (2/25/10)
2304 WBS_X.0.1 ANU Injection Line Internal Review Minutes
3112 WBS_X.0.1 ANU Transfer Line Review (April 21, 2008)
5003 WBS_X.0.1 ANU Recycler Transfer Line Review (July 12, 2010)
6043 WBS_X.0.1 WBS 2.1 - Bulletin #15 Information (NEW)
6195 WBS_X.0.1 ANU Recycler LLRF Review Report
3783 WBS_X.0.1, X.0.2 MI/RR Gap Clearing Kicker Design Review (3/31/09)
2491 WBS_X.0.2 NOvA ANU Main Injector Bus Bar Review
2331 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to Eliminate Dummy Module (6/8/07)
4625 WBS_X.0.3 Target/Baffle/Carrier Initial Design Review
2416 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to scope Target Chase Cooling Upgrades
4129 WBS_X.0.3 ANU Target Hall Chase Cooling- Initial Design Review (August 13, 2009)
4751 WBS_X.0.3 ANU Target Hall Chase Cooling- Final Design Review (April, May, 2010)
3539 WBS_X.0.3 ANU Horn 2 Relocation to Medium Energy- Initial Design Review (December 15 2008)
4978 WBS_X.0.3 ANU Horn 2 Relocation to Medium Energy- Final Design Review (July 22, 2010)
254 WBS_X.1 WBS 2.1 Peer Review
660 WBS_X.1 WBS 2.1 Expert Review
1141 WBS_X.1 Far Detector Installation Readiness Review (NEW)
2334 WBS_X.1 WBS 2.1 - HVAC Systems Review
2342 WBS_X.1 WBS 1.1.2.1  Review Results
2343 WBS_X.1 WBS 1.1.2.1 - SWPPP Review Results
2344 WBS_X.1 WBS 1.1.2.2 - Far Detector Building Review Results
3076 WBS_X.1 WBS 2.1 LEED Correspondence with the University of Minnesota
4405 WBS_X.1 WBS 1.1.5 - Near Detector Surface Building Review Results
5233 WBS_X.1 WBS 2.1 - Bulletin #8 Information (NEW)
5377 WBS_X.1 WBS 2.1.5 - Far Detector Building Outfitting Drawings (NEW)
5475 WBS_X.1 WBS 2.1 - Bulletin #9 Information (NEW)
5478 WBS_X.1 WBS 2.1 - Bulletin #10 Information (NEW)
5503 WBS_X.1 WBS 2.1.5 - FDB Outfitting Review Results (NEW)
5918 WBS_X.1 WBS 2.1 - Bulletin #14 Information (NEW)
2807 WBS_X.2 Requirements Document for the RFI Solicitation
4411 WBS_X.2 Fill Piping System and Scintillator Supply Room for Far Detector (NEW)
WBS_X.5 Manifold Cover & Snout Review (NEW)
WBS_X.5 NOvA Module Endplate Review (NEW)
1204 WBS_X.5 A Minimum thickness for the edge stiffener used in the end cell (3.88x6.0cm cell size)
1228 WBS_X.5 Fiber String Machine Review Presentation
1235 WBS_X.5 NOvA Module Design Review: November 2006
1310 WBS_X.5 Readiness Review Presentation for Module Glue
1453 WBS_X.5 Labor Estimates For Module Assembly in a Two-Factory Model
1833 WBS_X.5 Labor Estimates for 2x16 Extrusion Assembly at the Fermilab Wideband Lab
1978 WBS_X.5 CD2 Presentation on Module Design
2181 WBS_X.5 Photodetector Interface WBS 2.5.2 - Breakout for Director's CD2/3a Review
2320 WBS_X.5 Labor Estimates for Module Assembly in a One-Factory Model
2322 WBS_X.5 Labor Estimates for 2x16 Extrusion Assembly in a Warehouse Space Near Fermilab
2336 WBS_X.5 A Updated Stress Calculation for the Bottom Seal
2386 WBS_X.5 Module Factory Storage
4111 WBS_X.5 FHEP 31 Plane Block Assembly - Vertical (NEW)
4725 WBS_X.5 IPND General Layout (NEW)
5708 WBS_X.5 NOvA Far Detector Manifold Cover Design Files (NEW)
5709 WBS_X.5 NOvA Far Detector Snout Design Files (NEW)
5720 WBS_X.5 Manifold Cover & Snout Review Recommendations (NEW)
5815 WBS_X.5 FHEP Block Assembly Shipping & Handling (NEW)
6090 WBS_X.5 NOvA Far Detector Optical Connector Models and Drawings (NEW)
WBS_X.6 NOvA Optical Connector Review (NEW)
WBS_X.6 NOvA Electronics Review (NEW)
3012 WBS_X.6 APD module drawings (NEW)
5604 WBS_X.6 Cable tray and PDB/DCM tray support foot: FD (NEW)
788 WBS_X.7 Evaluation of ChipIdeas 41240 Quad 12-bit ADC
WBS_X.8_2.9 Scintillator Distribution System Design Review (NEW)
WBS_X.8_2.9 NOvA Module Endplate Review (NEW)
WBS_X.8_2.9 Block Pivoter Review (NEW)
495 WBS_X.8_2.9 Summary of Detector Structural Analysis for Engineering Review (NEW)
496 WBS_X.8_2.9 Close-Out Report from the Jan 11, 2006 engineering review of the NOvA conceptual structure design (NEW)
971 WBS_X.8_2.9 NOvA Far Detector Plane-Adhesive-Selection Readiness Review, Review Committee Report
1166 WBS_X.8_2.9 Baseline Readiness Review: NOvA Near Detector Mechanical Systems, Review Committee Report
1183 WBS_X.8_2.9 Baseline Readiness Review: Safety of Liquid Scintillator Handling Techniques, Review Committee Report
1209 WBS_X.8_2.9 Baseline Readiness Review: NOvA Far Detector Installation Procedures, Review Committee Report
1217 WBS_X.8_2.9 3 Extrusion Mechanical Tests (NEW)
1238 WBS_X.8_2.9 Readiness Review: IPND Systems Design, Review Committee Report
1347 WBS_X.8_2.9 Devcon 60 (NEW)
1431 WBS_X.8_2.9 Minutes of the NOvA Detector Assembly Level 3 Managers' Meetings, Feb. 13, 2007
1931 WBS_X.8_2.9 Summary of Review of Near Detector Excavation Options
1956 WBS_X.8_2.9 Baseline Readiness Review: Far Detector Structural Design -- Review Committee Report
2875 WBS_X.8_2.9 Design Review: Full-Scale Assembly Prototype (FSAP) Study, Review Committee Report (NEW)
2948 WBS_X.8_2.9

Design of the NOvA Adhesive Dispenser and Module Lifting Fixture (NEW)

3036 WBS_X.8_2.9 Design Review: Prototype Adhesive Dispenser for the FSAP
3111 WBS_X.8_2.9 Block Pivoter Design Review
3218 WBS_X.8_2.9 Review of Several Structural Aspects of NOvA Detector
4132 WBS_X.8_2.9 The Lifting Lug used in FHEP Pivoting Table Assembly (NEW)
4211 WBS_X.8_2.9 A Structural Analysis for the Steel Pallet and Pivoting Table used in FHEP (NEW)
4414 WBS_X.8_2.9 IPND Assembly Table and Shipping Frame (NEW)
5080 WBS_X.8_2.9 Engineering Note for the IPND Water Cooling System (NEW)
5213 WBS_X.8_2.9 IPND Scintillator Fill Piping FESHM Engineering Note (NEW)
5220 WBS_X.8_2.9 IPND/NDSB Handrail & Side Support System (NEW)
5471 WBS_X.8_2.9 Scintillator Fill Plumbing (NEW)
5685 WBS_X.8_2.9 FHEP Pivoter Test at CDF (March 1, 2011) (NEW)
5687 WBS_X.8_2.9 Far Detector End Plate: Design for Review (NEW)
5813 WBS_X.8_2.9 32 Plane Block Assembly for Far Detector (NEW)
5897 WBS_X.8_2.9 NOvA Far Detector Cooling System (NEW)
5910 WBS_X.8_2.9 Instrumentation for Block Installation and Monitoring (NEW)
5923 WBS_X.8_2.9 Far Detector Block Envelope Layout (NEW)
5941 WBS_X.8_2.9 Ash River Assembly Table (NEW)
6076 WBS_X.8_2.9 Positions of Relay Racks and Chillers (NEW)
6340 WBS_X.8_2.9 NOvA Water Cooling System Design Review Presentation (NEW)