docid WBS WBS description Title
4978 WBS 2.0 ANU Construction ANU Horn 2 Relocation to Medium Energy
3550 WBS 2.1 Site and Building Cooperative Agreement Cost Accounting Information
2996 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement IPT Responsility Matrix
3544 WBS 2.1 Site and Building WBS 2.1 - Cooperative Agreement Change Procedures
3980 WBS 2.2 Liquid Scintillator The IU Spectrophophotometer and Lovibond Tintometer
3981 WBS 2.2 Liquid Scintillator Chemical Analysis Methods for the Determination of the Composition of Liquid Scintillator
3982 WBS 2.2 Liquid Scintillator Setting Tintometer Specs for the NOvA Liquid Scintillator
3984 WBS 2.2 Liquid Scintillator Scintillator Light Output QA Test Plan
3698 WBS 2.4 PVC Extrusions QC Procedures for PVC Extrusions
3827 WBS 2.5 PVC Modules Module Factory Procedural Documents
3828 WBS 2.5 PVC Modules Descriptions of Equipment/Machines at Module Factory
3859 WBS 2.5 PVC Modules Fly Cutting Procedure
3858 WBS 2.5 PVC Modules Fiber Continuity Device Procedure
3860 WBS 2.5 PVC Modules Fiber Continuity Device
3829 WBS 2.5 PVC Modules Safety Concerns and Risk Mitigation for Machines in Module Factory
5091 WBS 2.5 PVC Modules Procedures for Near Detector Module Production
5109 WBS 2.5 PVC Modules NOvA PVC Pressure Testing Procedures
5186 WBS 2.5 PVC Modules Module Factory Far Detector Safety and Training Procedure Documents
5212 WBS 2.5 PVC Modules Procedure to Operate Reflectometer
4642 WBS 2.8 Near Detector Assembly Near Detector Assembly Procedure
5118 WBS 2.8 Near Detector Assembly ND Scint filling procedure and hazard analysis
2510 WBS 2.9 Far Detector Assembly Far Detector Filling Procedure