NOνA Design Reviews

3079 WBS 1.9 & 2.10 Consolidated Comments from all Director's and DOE Reviews, with updated status
  WBS 1.9 & 2.10 DOE Mini-Review, January 28, 2010
  WBS 1.9 & 2.10 Director’s CD-3b Review of the NOvA Project, June 16-18, 2009
  WBS 1.9 & 2.10 EIR CD2 Review of the NOνA Project, June, 2008
  WBS 1.9 & 2.10 DOE CD2 Review of the NOνA Project, April 30, 2008
  WBS 1.9 & 2.10 Director’s CD-2 Mini-Review of the NOvA Project, April 17, 2008
  WBS 1.9 & 2.10 DOE CD-2/3a Review of the NOνA Project October 23-25, 2007
3065 WBS 1.9 & 2.10 DOE EIR Review of the NOvA Project, November 26-30, 2007
3064 WBS 1.9 & 2.10 DOE CD-2/3a Review of the NOvA Project, October 23-25, 2007
  WBS 1.9 & 2.10 Director’s Follow-up CD-2/3a Review of NOvA, Aug 21 - 22, 2007
  WBS 1.9 & 2.10 Director's/DOE's Performance Management System Review of the NOvA Project (6/19/07 - 6/20/07)
  WBS 1.9 & 2.10 Director’s Preliminary Review of SNuMI Plan, Nov 14-16, 2006 (portions of this work incorporated into NOvA Project)
  WBS 1.9 & 2.10 Director’s CD-2/3a Review of NOvA (6/4/06 - 6/6/07)
  WBS 1.9 & 2.10 DOE Review Committee Review of NOvA (CD-1 Review, 4/4/06 - 4/6/06)
  WBS 1.9 & 2.10 Director's CD-1 Review of NOνA (2/28/06 - 3/2/06)
  WBS 1.9 & 2.10 Director's Preliminary Review of NOνA (7/18/05 - 7/20/05)
1901 WBS_X.0 1350-ES-296427 Fabrication of ANU Kicker Magnet Ceramic Beam Tubes
2603 WBS_X.0 ANU Design Concurrence on Kicker Cable
3113 WBS_X.0 Minutes of Kicker Magnet Review/Meeting
3366 WBS_X.0 FNAL Main Injector Gap-Clearing Kicker Design Review Report
2166 WBS_X.0.1 Recycler 53 MHz LLRF System
4575 WBS_X.0.1 53 MHz RF Cavity Design Review (2/25/10)
2304 WBS_X.0.1 ANU Injection Line Internal Review Minutes
3112 WBS_X.0.1 ANU Transfer Line Review ( April 21, 2008 )
5003 WBS_X.0.1 ANU Recycler Transfer Line Review (July 12, 2010)
3783 WBS_X.0.1, X.0.2 MI/RR Gap Clearing Kicker Design Review (3/31/09)
2491 WBS_X.0.2 NOvA ANU Main Injector Bus Bar Review
2331 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to Eliminate Dummy Module (6/8/07)
4625 WBS_X.0.3 Target/Baffle/Carrier Initial Design Review
2416 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to scope Target Chase Cooling Upgrades
4129 WBS_X.0.3 ANU Target Hall Chase Cooling- Initial Design Review (August 13, 2009)
4751 WBS_X.0.3 ANU Target Hall Chase Cooling- Final Design Review (April, May, 2010)
3539 WBS_X.0.3 ANU Horn 2 Relocation to Medium Energy- Initial Design Review (December 15 2008)
4978 WBS_X.0.3 ANU Horn 2 Relocation to Medium Energy- Final Design Review (July 22, 2010)
254 WBS_X.1 WBS 2.1 Peer Review
660 WBS_X.1 WBS 2.1 Expert Review
3076 WBS_X.1 WBS 2.1 LEED Correspondence with the University of Minnesota
2334 WBS_X.1 WBS 2.1 - HVAC Systems Review
2342 WBS_X.1 WBS 1.1.2.1  Review Results
2343 WBS_X.1 WBS 1.1.2.1 - SWPPP Review Results
2344 WBS_X.1 WBS 1.1.2.2 - Far Detector Building Review Results
4405 WBS_X.1 WBS 1.1.5 - Near Detector Surface Building Review Results
2807 WBS_X.2 Requirements Document for the RFI Solicitation
1204 WBS_X.5 A Minimum thickness for the edge stiffener used in the end cell (3.88x6.0cm cell size)
1228 WBS_X.5 Fiber String Machine Review Presentation
1235 WBS_X.5 NOvA Module Design Review: November 2006
1310 WBS_X.5 Readiness Review Presentation for Module Glue
1453 WBS_X.5 Labor Estimates For Module Assembly in a Two-Factory Model
1833 WBS_X.5 Labor Estimates for 2x16 Extrusion Assembly at the Fermilab Wideband Lab
1978 WBS_X.5 CD2 Presentation on Module Design
2181 WBS_X.5 Photodetector Interface WBS 2.5.2 - Breakout for Director's CD2/3a Review
2320 WBS_X.5 Labor Estimates for Module Assembly in a One-Factory Model
2322 WBS_X.5 Labor Estimates for 2x16 Extrusion Assembly in a Warehouse Space Near Fermilab
2336 WBS_X.5 A Updated Stress Calculation for the Bottom Seal
2386 WBS_X.5 Module Factory Storage
788 WBS_X.7 Evaluation of ChipIdeas 41240 Quad 12-bit ADC
496 WBS_X.8_2.9 Close-Out Report from the Jan 11, 2006 engineering review of the NOvA conceptual structure design
971 WBS_X.8_2.9 NOvA Far Detector Plane-Adhesive-Selection Readiness Review, Review Committee Report
1166 WBS_X.8_2.9 Baseline Readiness Review: NOvA Near Detector Mechanical Systems, Review Committee Report
1183 WBS_X.8_2.9 Baseline Readiness Review: Safety of Liquid Scintillator Handling Techniques, Review Committee Report
1209 WBS_X.8_2.9 Baseline Readiness Review: NOvA Far Detector Installation Procedures, Review Committee Report
1238 WBS_X.8_2.9 Readiness Review: IPND Systems Design, Review Committee Report
1931 WBS_X.8_2.9 Summary of Review of Near Detector Excavation Options
1956 WBS_X.8_2.9 Baseline Readiness Review: Far Detector Structural Design -- Review Committee Report
3036 WBS_X.8_2.9 Design Review: Prototype Adhesive Dispenser for the FSAP
3111 WBS_X.8_2.9 Block Pivoter Design Review
3218 WBS_X.8_2.9 Review of Several Structural Aspects of NOvA Detector