NOνA Value Engineering Documents

docid WBS title
2846
WBS_1.9_2.10
Summer, 2007: NOvA Project-Wide Value Management Study
1908 WBS_X.0.1 Effect of the MI-10 Kicker Tail
2393 WBS_X.0.1 ANU  - Optimizing Kicker Designs/Specs based on MI Measurements
2491 WBS_X.0.2 NOvA ANU Main Injector Bus Bar Review
2331 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to Eliminate Dummy Module
2416 WBS_X.0.3 ANU NuMI Upgrades - Notes on meeting to scope Target Chase Cooling Upgrades
1802 WBS_X.0.4 Bunch-Batch Optimization
140 WBS_X.1 WBS 2.1 Value Management Recommendations
1496 WBS_X.1 WBS 2.1 - Value Management Studies
2648 WBS_X.1 WBS 2.1.1.4 - Site Prep Package Value Analysis Study
2649 WBS_X.1 WBS 2.1.2.3.2 - Mechanical Systems Value Analysis Study
2650 WBS_X.1 WBS 2.1.2.3.1.10 - Cosmic Ray Shielding Value Analysis Study
2651 WBS_X.1 WBS 2.1.2.3.1.11 - Far Detector Building Value Analysis Study
2807 WBS_X.2 Requirements Document for the RFI Solicitation
2808 WBS_X.2 Evaluation of RFI Responses by Chicago Chemical Corp
2809 WBS_X.2 Responses to Toll Blending RFI
251 WBS_X.4 Shipping, Handling and Logistics of PVC Extrusions and Modules
818 WBS_X.5 On Module Adhesive Selection
844 WBS_X.5 Adhesive Selection: Part II
884 WBS_X.5 Manifold design  for NOVA in the North
1350 WBS_X.5 Adhesive Strength in Single Mode Loading
1833 WBS_X.5 Labor Estimates for 2x16 Extrusion Assembly at the Fermilab Wideband Lab
2386 WBS_X.5 Module Factory Storage
2849 WBS_X.5 Extrusion Module Factory Value Management Study
1931 WBS_X.8_2.9 Summary of Review of Near Detector Excavation Options