| 3079 | WBS 1.9 & 2.10 | Consolidated Comments from all Director's and DOE Reviews, with updated status | |
| 3065 | WBS 1.9 & 2.10 | DOE EIR Review of the NOvA Project, November 26-30, 2007 | |
| 3064 | WBS 1.9 & 2.10 | DOE CD-2/3a Review of the NOvA Project, October 23-25, 2007 | |
| WBS 1.9 & 2.10 | Director’s Follow-up CD-2/3a Review of NOvA, Aug 21 - 22, 2007 | ||
| WBS 1.9 & 2.10 | Director's/DOE's Performance Management System Review of the NOvA Project (6/19/07 - 6/20/07) | ||
| WBS 1.9 & 2.10 | Director’s Preliminary Review of SNuMI Plan, Nov 14-16, 2006 (portions of this work incorporated into NOvA Project) | ||
| WBS 1.9 & 2.10 | Director’s CD-2/3a Review of NOvA (6/4/06 - 6/6/07) | ||
| WBS 1.9 & 2.10 | DOE Review Committee Review of NOvA (CD-1 Review, 4/4/06 - 4/6/06) | ||
| WBS 1.9 & 2.10 | Director's CD-1 Review of NOνA (2/28/06 - 3/2/06) | ||
| WBS 1.9 & 2.10 | Director's Preliminary Review of NOνA (7/18/05 - 7/20/05) | ||
| 1901 | WBS_X.0 | 1350-ES-296427 Fabrication of ANU Kicker Magnet Ceramic Beam Tubes | |
| 2603 | WBS_X.0 | ANU Design Concurrence on Kicker Cable | |
| 2166 | WBS_X.0.1 | Recycler 53 MHz LLRF System | |
| 2304 | WBS_X.0.1 | ANU Injection LIne Internal Review Minutes | |
| 3112 | WBS_X.0.1 | ANU Transfer Line Review ( April 21, 2008 ) | |
| 2491 | WBS_X.0.2 | NOvA ANU Main Injector Bus Bar Review | |
| 2331 | WBS_X.0.3 | ANU NuMI Upgrades - Notes on meeting to Eliminate Dummy Module | |
| 2416 | WBS_X.0.3 | ANU NuMI Upgrades - Notes on meeting to scope Target Chase Cooling Upgrades | |
| 254 | WBS_X.1 | WBS 2.1 Peer Review | |
| 660 | WBS_X.1 | WBS 2.1 Expert Review | |
| 2334 | WBS_X.1 | WBS 2.1 - HVAC Systems Review | |
| 2342 | WBS_X.1 | WBS 1.1.2.1 Review Results | |
| 2343 | WBS_X.1 | WBS 1.1.2.1 - SWPPP Review Results | |
| 2344 | WBS_X.1 | WBS 1.1.2.2 - Far Detector Building Review Results | |
| 2807 | WBS_X.2 | Requirements Document for the RFI Solicitation | |
| 1204 | WBS_X.5 | A Minimum thickness for the edge stiffener used in the end cell (3.88x6.0cm cell size) | |
| 1228 | WBS_X.5 | Fiber String Machine Review Presentation | |
| 1235 | WBS_X.5 | NOvA Module Design Review: November 2006 | |
| 1310 | WBS_X.5 | Readiness Review Presentation for Module Glue | |
| 1453 | WBS_X.5 | Labor Estimates For Module Assembly in a Two-Factory Model | |
| 1833 | WBS_X.5 | Labor Estimates for 2x16 Extrusion Assembly at the Fermilab Wideband Lab | |
| 1978 | WBS_X.5 | CD2 Presentation on Module Design | |
| 2181 | WBS_X.5 | Photodetector Interface WBS 2.5.2 - Breakout for Director's CD2/3a Review | |
| 2320 | WBS_X.5 | Labor Estimates for Module Assembly in a One-Factory Model | |
| 2322 | WBS_X.5 | Labor Estimates for 2x16 Extrusion Assembly in a Warehouse Space Near Fermilab | |
| 2336 | WBS_X.5 | A Updated Stress Calculation for the Bottom Seal | |
| 2386 | WBS_X.5 | Module Factory Storage | |
| 788 | WBS_X.7 | Evaluation of ChipIdeas 41240 Quad 12-bit ADC | |
| 496 | WBS_X.8_2.9 | Close-Out Report from the Jan 11, 2006 engineering review of the NOvA conceptual structure design | |
| 971 | WBS_X.8_2.9 | NOvA Far Detector Plane-Adhesive-Selection Readiness Review, Review Committee Report | |
| 1166 | WBS_X.8_2.9 | Baseline Readiness Review: NOvA Near Detector Mechanical Systems, Review Committee Report | |
| 1183 | WBS_X.8_2.9 | Baseline Readiness Review: Safety of Liquid Scintillator Handling Techniques, Review Committee Report | |
| 1209 | WBS_X.8_2.9 | Baseline Readiness Review: NOvA Far Detector Installation Procedures, Review Committee Report | |
| 1238 | WBS_X.8_2.9 | Readiness Review: IPND Systems Design, Review Committee Report | |
| 1931 | WBS_X.8_2.9 | Summary of Review of Near Detector Excavation Options | |
| 1956 | WBS_X.8_2.9 | Baseline Readiness Review: Far Detector Structural Design -- Review Committee Report | |
| 3036 | WBS_X.8_2.9 | Design Review: Prototype Adhesive Dispenser for the FSAP | |
| 3111 | WBS_X.8_2.9 | Block Pivoter Design Review | |